Currently Out To Bid
Hardy County, West Virginia
CONTRACT #1 - (PHASE 1 BAKER) BAKER WATER TREATMENT PLANT
Bid Date: Friday, August 27, 2010 at 11:00 a.m., L.P.T. at the Hardy County PSD, located at 2094 U.S. 20 South, Moorefield, Hardy County, West Virginia.
Pre-Bid: Wednesday, August 11, 2010 at 1:00 p.m., L.P.T. at the Hardy County PSD, located at 2094 U.S. 220 South, Moorefield, Hardy County, West Virginia.
The approximate quantities of work are described as follows:
The project consists of a 350 GPM water treatment plant including chemical feed, two (2) integrated water treatment systems consisting of flocculators, settling basins, and membrane ultrafiltration, chemical clean-in place systems, backwash waste tanks, and treatment plant building.
The Work will be substantially completed within 330 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 365 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000.00 per day.
Complete sets of Drawings and Specifications may be obtained from the office of Thrasher Engineering, Inc., 30 Columbia Blvd., P. O. Box 1532, Clarksburg, WV 26302-1532, for the following cost of $200.00 per set. Amounts paid are not subject to refund.
Thrasher Engineering(304) 624-4108
Contractors Association of West Virginia(304) 342-1166
Dodge Reports(304) 722-3192
Hardy County PSD (304) 530-3048
Hardy County, West Virginia
CONTRACT #2 - (PHASE 1 BAKER) BAKER AREA WATER DISTRIBUTION SYSTEM
Bid Date: Friday, August 27, 2010 at 11:00 a.m., L.P.T. at the Hardy County PSD, located at 2094 U.S. 20 South, Moorefield, Hardy County, West Virginia.
Pre-Bid: Wednesday, August 11, 2010 at 1:00 p.m., L.P.T. at the Hardy County PSD, located at 2094 U.S. 220 South, Moorefield, Hardy County, West Virginia.
The approximate quantities of work are described as follows:
1 LS videotaping of project area, 1 LS erosion and sediment control measures, 28,440 LF of 10" PVC C-900 DR-14 water line, 12,675 LF of 10" PVC C-900 DR-18 water line, 230 LF of 10" ductile iron CL-50 mechanical joint pipe with mega-lugs, 5,915 LF of 8" PVC C-900 DR-14 water line, 1,790 LF of 8" C-900 DR-18 water line, 75 LF of 8" ductile iron CL-50 mechanical joint pipe with mega-lugs, 5,280 LF of 6" PVC C-900 DR-14 water line, 2,730 LF of 6" PVC C-900 DR-18 water line, 760 LF of 2" PVC SDR-17 CL-250, 65 LF of 1 ½" PVC SDR-9 water line, 495 LF of 20" steel casing (bore & jack) with casing spacers, 270 LF of 20" steel casing (open cut) with casing spacers, 465 LF of 16" steel casing (bore & jack) with casing spacers, 150 LF of 16" steel casing (open cut) with casing spacers, 160 LF of 12" steel casing (bore & jack) with casing spacers, 25 LF of 4" Steel Casing (bore & jack) with casing spacers, 40 LF of 3" steel casing (bore & jack) with casing spacers, 27 EA 10" mechanical joint gate valve with box and lid (complete in place), 12 EA 8" mechanical joint gate valve with box and lid (complete in place), 12 EA 6" mechanical joint gate valve with box and lid (complete in place), 1 EA 2" mechanical joint gate valve with box and lid (complete in place), 24 EA fire hydrant assembly (complete in place), 3 EA 2" post flushing hydrant assembly (complete in place), 110 EA high pressure meter settings (HPMS), 35 LF of 1" polyethylene service tubing (bore & jack), 320 LF of 1" polyethylene service tubing (open cut), 1,315 LF of 3/4" polyethylene service tubing (bore & jack), 2,245 LF of 3/4" polyethylene service tubing (open cut), 1 EA 1" East Hardy High School Complex meter (complete in place), 1 EA 1" East Hardy Middle School Complex Meter (complete in place), 1 EA 1 ½" E.A. Hawes Nursing and Rehab Center meter (complete in place), 1 EA 8" mechanical joint cap or plug, 1 EA 6" mechanical joint cap or plug, 1 EA 2" mechanical joint cap or plug, 2 EA concrete anchors (complete in place), 335 LF of stream bank slope protection, 190 LF of concrete driveway/road repair, 1,055 LF of HMA driveway/road repair, 400 LF of HMA shoulder overlay (min. 8' wide), 80 LF of gravel driveway/road repair, 125 LF of WVDOH type “A” trench repair, 140 LF of WVDOH type “C” trench repair, 2,000 EA radio read MXU units with vehicle units and necessary software, 1 LS meter reading software upgrades, 164 EA hydrant locks, 40 LF of 18" HDPE culvert, 200 LF of 12" HDPE directional bore (complete in place), and necessary appurtenances.
The Work will be substantially completed within 330 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 365 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000.00 per day.
Complete sets of Drawings and Specifications may be obtained from the office of Thrasher Engineering, Inc., 30 Columbia Blvd., P. O. Box 1532, Clarksburg, WV 26302-1532, for the following cost of $150.00 per set. Amounts paid are not subject to refund.
Thrasher Engineering(304) 624-4108
Contractors Association of West Virginia(304) 342-1166
Dodge Reports(304) 722-3192
Hardy County PSD (304) 530-3048
Hardy County, West Virginia
CONTRACT #4 - (PHASE 1 BAKER) MARVIN CHAPEL WATER LINE EXTENSION
Bid Date: Friday, August 27, 2010 at 11:00 a.m., L.P.T. at the Hardy County PSD, located at 2094 U.S. 20 South, Moorefield, Hardy County, West Virginia.
Pre-Bid: Wednesday, August 11, 2010 at 1:00 p.m., L.P.T. at the Hardy County PSD, located at 2094 U.S. 220 South, Moorefield, Hardy County, West Virginia.
The approximate quantities of work are described as follows:
1 LS videotaping of project area, 1 LS erosion and sediment control measures, 2,510 LF of 6" PVC C-900 DR-14, 8,240 LF of 6" PVC C-900 DR -18, 9,635 LF of 6" ductile iron CL-50 push joint pipe, 185 LF 12" steel casing (bore and jack) with casing spacers, 15 LF of 12" steel casing (open cut) with casing spacers, 12 EA 6" mechanical joint gate valve with box and lid (complete in place), 11 EA fire hydrant assembly (complete in place), 1 EA 2" post flushing hydrant, 2 EA air release valve, 62 EA high pressure meter settings (HPMS), 1,700 LF of 3/4" polyethylene service tubing (open cut), 500 LF of 3/4" polyethylene service tubing (bore and jack), 90 LF of stream bank slope protection, 130 LF of HMA driveway/road repair, 40 LF of concrete driveway/road repair, 4,350 LF of WVDOH rock lined ditch, 3 EA 6" mechanical joint caps or plugs, 1 EA tie-into existing water line (complete in place), 1 LS 54 GPM above ground booster station, and miscellaneous appurtenances.
The Work will be substantially completed within 150 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 180 days after the date when the Contract Times commence to run.
Complete sets of Drawings and Specifications may be obtained from the office of Thrasher Engineering, Inc., 30 Columbia Blvd., P. O. Box 1532, Clarksburg, WV 26302-1532, for the following cost of $150.00 per set. Amounts paid are not subject to refund.
Thrasher Engineering(304) 624-4108
Contractors Association of West Virginia(304) 342-1166
Dodge Reports(304) 722-3192
Hardy County PSD (304) 530-3048
Hardy County, West Virginia
CONTRACT #5 - (PHASE 1 BAKER) PROPOSED PARKER HOLLOW, AND MARVIN CHAPEL WATER STORAGE TANKS
Bid Date: Friday, August 27, 2010 at 11:00 a.m., L.P.T. at the Hardy County PSD, located at 2094 U.S. 20 South, Moorefield, Hardy County, West Virginia.
Pre-Bid: Wednesday, August 11, 2010 at 1:00 p.m., L.P.T. at the Hardy County PSD, located at 2094 U.S. 220 South, Moorefield, Hardy County, West Virginia.
The approximate quantities of work are described as follows:
1 LS mobilization/demobilization, 1 LS videotaping of project area, 1 LS erosion and sediment control, 1 LS Parker Hollow water storage tank (including foundation), 1 LS Parker Hollow water storage tank site grading and preparation (including site stone and filter fabric), 1 LS Parker Hollow water storage tank access road grading and preparation (including stone, filter fabric, and necessary drainage structures), 1 LS Parker Hollow water storage tank valve vault (including piping and valves), 1 LS Marvin Chapel water storage tank (including foundation), 1 LS Marvin Chapel water storage tank site grading and preparation (including site stone and filter fabric), 1 LS Marvin Chapel water storage tank access road grading and preparation (including stone, filter fabric, and necessary drainage structures), 1 LS Marvin Chapel water storage tank valve vault (including piping and valves), 20 LF of 10" ductile iron CL-50 water line, 40 LF of 6" ductile iron CL-50 water line, 715 LF of chain link fencing (including two (2) 6' swing gates at each site), 1 LS Parker Hollow water storage tank electric service (including service entrance pole and conduit), 1 LS Marvin Chapel water storage tank electric service (including service entrance pole and conduit), 50 LF of dumped rock gutter, and necessary appurtenances.
The Work will be substantially completed within 150 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 180 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000.00 per day.
Complete sets of Drawings and Specifications may be obtained from the office of Thrasher Engineering, Inc., 30 Columbia Blvd., P. O. Box 1532, Clarksburg, WV 26302-1532, for the following cost of $100.00 per set. Amounts paid are not subject to refund.
Thrasher Engineering(304) 624-4108
Contractors Association of West Virginia(304) 342-1166
Dodge Reports(304) 722-3192
Hardy County PSD (304) 530-3048
Harrison County, West Virginia
CONTRACT #1 - Robert C. Byrd High School Athletic Field Improvements
Bid Date: Friday, August 6, 2010 at 10:00 AM, L.P.T. at the Field Services Conference Room of Thrasher Engineering, Inc., 30 Columbia Blvd., Clarksburg, Harrison County, West Virginia.
Pre-Bid: Thursday, July 22, 2010 at 11:00 a.m., L.P.T. at the Field Services Conference Room of Thrasher Engineering, Inc., 30 Columbia Blvd., Clarksburg, Harrison County, West Virginia.
The approximate quantities of work are described as follows:
Construction is to include the earthwork associated with the addition of artificial turf to the existing football field. Major items of work include grading, drainage, erosion and sediment control, concrete curb, storm sewer and other appurtenances.
The Work will be substantially completed within 30 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 30 calendar days after the date when the Contract Times commence to run. Liquidated damages shall be $2,500.00 per day.
Complete sets of Drawings and Specifications may be obtained from the office of Thrasher Engineering, Inc., 30 Columbia Blvd., P. O. Box 1532, Clarksburg, WV 26302-1532, for the following cost of $50.00 per set. Amounts paid are not subject to refund.
NOTE: Plans and specifications will not be available until the pre-bid conference on Thursday, July 22, 2010 at 11:00 a.m.
Thrasher Engineering(304) 624-4108
Contractors Association of West Virginia(304) 342-1166
Dodge Reports(304) 722-3192
Harrison County Board of Education(304) 624-3300
Harrison County, West Virginia
JOHNSON AVENUE ROAD WIDENING PROPOSED UTILITY RELOCATION
Bid Date: on Tuesday, August 3, 2010 at 2:00 PM, L.P.T. at the City of Bridgeport City Council, 515 West Main Street, Bridgeport, Harrison County, West Virginia
MANDATORY Pre-Bid: Tuesday, July 20, 2010 at 10:00 a.m., L.P.T. at the City of Bridgeport City Council, located at 515 West Main Street, Bridgeport, Harrison County, West Virginia
The approximate quantities of work are described as follows:
1 LS videotaping of project area, 1 LS erosion and sediment control, 206 LF 12" ductile iron 350 psi gravity sewer pipe (0'-6' deep) remove and replace at grade shown, 80 LF of 12" PVC SDR 35 gravity sewer pipe (0'-6' deep), 80 LF of 12" PVC SDR-35 gravity sewer pipe (6'-9' deep), 1650 LF of 10" ductile iron force main, 400 LF of 8" PVC SDR 35 gravity sewer pipe (0'-6' deep), 66 LF of 8" PVC SDR-35 gravity sewer pipe (6'-9' deep), 1800 LF of 8" ductile iron 350 psi water line, 200 LF of 6" ductile iron 350 psi water line, 58 LF of 24" steel casing (bore & jack), 60 LF of 16" steel casing (bore & jack), 155 LF of 16" steel casing (open cut), 30 LF of 12" steel casing (open cut), 5 EA sanitary manholes, 1 EA straddle manhole, 1 EA remove and replace existing manhole, 8 VF 48" diameter manhole riser pipe, 2 EA manhole drop connection, 2 EA cut and plug existing 12" gravity sewer pipe, 2 EA cut and plug existing 10" PVC force main, 1 EA cut and plug 12" water line, 4 EA cut and plug existing 6" water line, 8 EA sanitary sewer customer service tie-in, 2 EA tie into existing sanitary manhole, 2 EA tie into existing 10" PVC force main, 1 EA sewer combination vacuum/air release valve, 40 LF concrete encasement, 2 EA 8" gate valve with box and lid, 2 EA 6" gate valve with box and lid, 1 EA 2" gate valve with box and lid, 6 EA tie into 6" water line, 2 EA water meter services tie-in and high pressure meter settings, 1 EA 10" force main pressure in-line clean-out, 300 LF concrete drive and street trench repair, 150 LF WVDOH type “B” trench repair, 1240 LF WVDOH type “B” force main trench repair in county Rt. 24 and 76/50, 80 LF WVDOH rock lined ditch, 130 LF HMA street and drive repair, 150 TN 2" HMA overlay, 30 LF gravel drive repair, 2 EA fire hydrant assembly, 8 EA tie-in existing water service meters, 110 LF concrete curbing, 10 LF concrete sidewalk repair, 1 LS bypass pumping during construction, 10 EA stated allowance fixed fee per incident for accidental utility and structure damage, 3 EA abandonment of existing manholes, 4287 LF reclamation of disturbed area, 1 LS traffic control, and other miscellaneous appurtenances.
The Work will be substantially completed within 75 days after the date when the Contract Times commence to run, and completed and ready for final payment within 90 days after the date when the Contract Times commence to run. Liquidated damages shall be $500.00 per day.
Complete sets of Drawings and Specifications may be obtained from the office of Thrasher Engineering, Inc., 30 Columbia Blvd., P. O. Box 1532, Clarksburg, WV 26302-1532, for the following cost of $100.00 per set. Amounts paid are not subject to refund.
Prime Contractors Intent to Bid
Bear Contracting (304) 842-3002
Cowgirl Up (304) 626-1051
E.L. Harper & Son, Inc. (304) 428-2083
FAMCO, Inc. (304) 529-3328
J.F. Allen Company (304) 472-8890
Jimmy Dunn Excavating (304) 984-3246
Laurita Excavating (304) 296-7531
Mountaineer Contractors (304) 842-8691
Orange Construction Corporation (304) 291-6765
Pro Contracting (304) 622-2400
Pipe Plus (304) 769-5810
Versa-Con, Inc. (304) 727-4109
Thrasher Engineering (304) 624-4108
Contractors Association of West Virginia (304) 342-1166
Dodge Reports (304) 722-3192
City of Bridgeport (304) 842-8200
Mountaineer Contractors (304) 842-8691
J.F. Allen Company (304) 472-8890
FAMCO, Inc. (304) 529-3328
Parkersburg-Marietta Contractors Association (304) 485-6485
Laurita Excavating (304) 296-7531
Versa-Con, Inc. (304) 727-4109
Green River Group (304) 594-3991
Rover Construction (304) 759-2100
Savage Heavy Highway (304) 242-3100
Bear Contracting (304) 842-3002
Pro Contracting (304) 622-2400
Jimmy Dunn Excavating (304) 984-3246
Cowgirl Up (304) 626-1051
Pipe Plus (304) 769-5810
Marion County, West Virginia
CONTRACT #2 - SIDEWALKS AND STEP REPLACEMENT
Bid Date: Thursday, July 29, 2010 at 2:00 PM, L.P.T. at the Town of Farmington, 1314 Mill Street, Farmington, Marion County, West Virginia
MANDATORY Pre-Bid: Thursday, July 8, 2010 at 10:00 a.m., L.P.T. at the Town of Farmington, located at 1314 Mill Street, Farmington Marion County, West Virginia
The approximate quantities of work are described as follows:
Construction of approximately 345LF of concrete curb, 185 SY of concrete sidewalk, 250 SY of concrete steps, 675 LF aluminum handrail, as well as, several other miscellaneous items along Valley School Drive.
The Work will be substantially completed within 75 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 90 calendar days after the date when the Contract Times commence to run. Liquidated damages shall be $500.00 per day.
Complete sets of Drawings and Specifications may be obtained from the office of Thrasher Engineering, Inc., 30 Columbia Blvd., P. O. Box 1532, Clarksburg, WV 26302-1532, for the following cost of $ 50.00 per set. Amounts paid are not subject to refund.
Thrasher Engineering (304) 624-4108
Contractors Association of West Virginia (304) 342-1166
Dodge Reports (304) 722-3192
Town of Farmington (304) 825-6442
D&M Contracting (724) 668-8775
Debellis Construction (304) 203-5655
Dodd General Contractors (304) 622-7083
Green River Group (304) 594-3991
Construction Employers Association (304) 367-1290
Washington County, Maryland
CONTRACT #4 - INFLOW AND INFILTRATION REDUCTION PROJECT (PUMP STATIONS)
Bid Date: Friday, August 6, 2010 at 2:00 PM, L.P.T. at the Town of Williamsport at their office located 2 North Conococheague Street, Williamsport, Washington County, Maryland
Pre-Bid: Wednesday, July 7, 2010 at 2:00 P.m., L.P.T. at the Town of Williamsport at their office located 2 North Conococheague Street, Williamsport, Washington County, Maryland
The approximate quantities of work are described as follows:
Project consists of 1LS mobilization/demobilization, 1 LS videotaping of project area, 1 LS erosion and sediment control measures, 1 LS pump station #1 rehabilitation, 1 LS pump station #2 rehabilitation, 1 LS pump station #3 rehabilitation, 1 LS pump station #4 rehabilitation, 1 LS reclamation of disturbed area (seeding and mulching), and miscellaneous appurtenances.
The Work will be substantially completed within 180 calendar days after the date when the Contract Time commences to run, and completed and ready for final payment within 210 days after the date when the Contract Time commences to run. Liquidated damages shall be $1,000.00 per day.
Complete sets of Drawings and Specifications may be obtained from the office of Thrasher Engineering, Inc., 30 Columbia Blvd., Clarksburg, WV 26301for the following cost of $150.00 per set. Amounts paid are not subject to refund.
NOTE: Last date for questions on this project is Friday, July 23, 2010 by 5:00 PM L.P.T.
Thrasher Engineering (304) 624-4108
Thrasher Engineering (301) 334-3866
Dodge Reports (410) 821-8046
Town of Williamsport (301) 223-7711
Construction Data Co. (512) 634-5972
Reed Construction Data (800) 304-0059
Callas Contractors, Inc. (301) 739-8400
C. William Hetzer, Inc. (301) 733-7300
W.F. Delauter (301) 447-5881
Altoona Builders Exchange (814) 944-5444
L/B Water Service (717) 264-8445
Mid-Atlantic BX (717) 901-7926
Alvarez Contractors (301) 662-5283
Charles Brake (800) 443-1133
H.D. Supply (304) 263-6986
Contractors Association of West Virginia (304) 342-1166
Mendon Pipeline (585) 624-5880
AMES, Inc. (410) 995-6971
Snyder Environmental (304) 725-9140
Heritage Contracting (304) 267-6559
Trademark Contracting Corp. (301) 582-5888
Ferguson Waterworks (540) 542-0170
Gold Diggers (304) 842-3375
Conewago Enterprises (717) 632-7722
Ferri Contracting Co. (724) 222-2297
Antietam Electrical Contractors, Inc. (301) 223-1152
Fluid Solutions (443) 324-2979
|
|